<rt id="xa1e5"></rt>

<wbr id="xa1e5"><strike id="xa1e5"></strike></wbr>

        <abbr id="xa1e5"></abbr>
        中文国产成人精品久久不卡,亚洲国产精品一区二区第一页,亚洲人成电影在线天堂色,av中文字幕国产精品,亚洲精品毛片一区二区,二区中文字幕在线观看,一区二区不卡国产精品,精品一卡2卡三卡4卡乱码精品视频
        ×
        full text search
        Search
        ×
        Prompt information:
        Confirm
        +8618562287971
        NEWS&EVENTS
        Home > News&Events > Company news > What are the precautions for operating electrolytic antimony equipment in low temperature environment?
        Latest News
        Its main purpose is to collect the high-temperature flue gas rich in Sb?O? that volatilizes from the smelting furnace...
        2025.11.12
        Choosing mature solvent extraction-electrowinning technology and reliable copper extraction equipment is undoubtedly a key step in achieving efficient resource conversion and maximizing economic value...
        2025.11.12
        In the copper sulfide ore smelting process, the anode casting step is crucial...
        2025.11.11
        Exploring key auxiliary processes in scrap copper smelting..
        2025.11.11
        This document details the electrolytic refining process of scrap copper in an electrolytic cell...
        2025.11.10

        What are the precautions for operating electrolytic antimony equipment in low temperature environment?

        Release time:2025-06-07 12:42 Views:

        In a low-temperature environment, the stable operation of electrolytic antimony equipment faces many challenges. To ensure production safety and efficiency, the following precautions are strictly implemented.

        Electrolytic antimony equipment

        1. Temperature monitoring and control

        Real-time monitoring of the temperature of the electrolytic cell and the surrounding environment to ensure that the electrolyte temperature is maintained in the optimal working range of 20℃-35℃. Low temperature may cause the electrolyte resistance to increase and the polarization degree to increase, affecting the electrolytic efficiency of antimony. If the temperature is lower than 20℃, it is necessary to start the heating device or reduce the current density to avoid increased energy consumption and decreased production efficiency.

        2. Humidity and condensation protection

        When low temperature is accompanied by humidity changes, condensation is likely to occur. Dehumidification equipment needs to be installed to control the humidity between 45%-55% to prevent the circuit board from being damp and short-circuited. Check the sealing of the electrolytic cell regularly to avoid external moisture intrusion.

        3. Equipment preheating and startup

        Before starting the equipment under extremely cold conditions, the electrolytic cell and power system need to be preheated to gradually increase the internal temperature to a safe range. It is strictly forbidden to start cold equipment directly to prevent the electrode material from being brittle or the seal from failing due to excessive temperature difference.

        4. Electrolyte circulation and concentration management

        Low temperature will reduce the solubility of antimony ions in the electrolyte, and circulation needs to be strengthened to maintain uniform concentration. Regularly test the electrolyte composition, supplement the anode mud filtrate or wash water, and avoid the quality of cathode sediments deteriorating due to excessive concentration gradient.

        5. Emergency plan and inspection mechanism

        Formulate a special low-temperature emergency plan and reserve key spare parts such as power supplies and electrodes. Increase the frequency of manual and intelligent inspections, focus on monitoring vulnerable parts such as temperature sensors and power interfaces, and immediately shut down for abnormalities.

        6. Equipment maintenance and personnel training

        Regularly check the low-temperature adaptability of components such as the electrolytic cell insulation layer and conductive copper rods, and replace aging seals in time. Conduct low-temperature operation training for operators to strengthen safety awareness and emergency response capabilities.

        The above measures can effectively reduce the impact of low-temperature environments on electrolytic antimony equipment and ensure production continuity and product quality.


        主站蜘蛛池模板: 天天躁日日躁狠狠躁中文字幕| 少妇人妻无码专区视频| 亚洲国产成人精品综合色| 国产精品无码a∨麻豆| 免费看的日韩精品黄色片| 遂宁市| 日韩精品一区二区三区四| a级黑人大硬长爽猛出猛进| 亚洲熟女乱一区二区三区| 在线免费成人亚洲av| 99久久婷婷国产综合精品青草漫画| 国产一级小视频| 喷潮出白浆视频在线观看| 成年女性特黄午夜视频免费看 | 亚洲欧美综合精品成人网站| 亚洲婷婷六月的婷婷| 久久热这里只有精品66| 日本中文字幕不卡在线一区二区| 亚洲日本韩国欧美云霸高清| 亚洲一区二区在线无码| 亚洲av成人午夜福利| 推油少妇久久99久久99久久| 涩涩爱狼人亚洲一区在线| 日本精品一区二区不卡| 国产边摸边吃奶边叫做激情视频 | 无码一区二区三区av在线播放| 波多野结系列18部无码观看AV| 国产精品自拍自在线播放| 亚洲AV无码国产永久播放蜜芽| 久久精品午夜视频| 久久精品99国产国产精| 亚洲一区二区精品另类| 青青国产揄拍视频| 成年美女黄网站色大片免费看| 日韩精品福利视频在线观看 | 成在线人视频免费视频| 亚洲AV毛片一区二区三区| 四虎永久精品在线视频| 全黄h全肉边做边吃奶视频| 好吊视频一区二区三区人妖 | 国产亚洲一区二区三区av|