<rt id="xa1e5"></rt>

<wbr id="xa1e5"><strike id="xa1e5"></strike></wbr>

        <abbr id="xa1e5"></abbr>
        中文国产成人精品久久不卡,亚洲国产精品一区二区第一页,亚洲人成电影在线天堂色,av中文字幕国产精品,亚洲精品毛片一区二区,二区中文字幕在线观看,一区二区不卡国产精品,精品一卡2卡三卡4卡乱码精品视频
        ×
        full text search
        Search
        ×
        Prompt information:
        Confirm
        +8618562287971
        NEWS&EVENTS
        Home > News&Events > Company news > How to prevent the ring formation in rotary furnace
        Latest News
        Its main purpose is to collect the high-temperature flue gas rich in Sb?O? that volatilizes from the smelting furnace...
        2025.11.12
        Choosing mature solvent extraction-electrowinning technology and reliable copper extraction equipment is undoubtedly a key step in achieving efficient resource conversion and maximizing economic value...
        2025.11.12
        In the copper sulfide ore smelting process, the anode casting step is crucial...
        2025.11.11
        Exploring key auxiliary processes in scrap copper smelting..
        2025.11.11
        This document details the electrolytic refining process of scrap copper in an electrolytic cell...
        2025.11.10

        How to prevent the ring formation in rotary furnace

        Release time:2025-04-25 14:31 Views:

        Ring formation usually refers to the material sticking together in the high temperature zone, which hinders the operation of the equipment. This is a common problem in the operation of the rotary kiln. Preventing the ring formation phenomenon in the rotary kiln requires comprehensive control from multiple aspects such as raw material characteristics, operating parameters, equipment design and maintenance. The following are some key preventive measures:

        Rotary kiln

        I. Raw material control

        1. Avoid excessive content of alkaline substances (such as K?O, Na?O, Cl?, S) in the raw materials. These substances are prone to form low-melting point compounds at high temperatures and promote ring formation.

        Control the content of volatile components (such as chlorides and sulfides) in the raw materials to reduce the condensation and deposition of gaseous substances.

        2. Ensure that the raw material particles are uniform, avoid too fine powder (easy to fly and stick) or too large blocks (uneven heat transfer).

        3. Add high melting point substances (such as bauxite and silica sand) to increase the softening temperature of the material.

        Use mineralizers (such as fluorite) to promote the reaction of materials at low temperatures and reduce the residence time in the high temperature zone.

        2. Optimization of operating parameters

        1. Avoid local overheating (especially near the burner), the temperature of the high temperature zone should be 50~100°C lower than the melting temperature of the material.

        Use multi-stage temperature control to reduce the heat load in the high temperature zone.

        2. Appropriately increase the speed (such as 2~5 RPM) to enhance material tumbling and prevent static accumulation.

        Adjust the cylinder inclination (usually 2~5°), control the material residence time, and avoid excessive sintering.

        3. Control the oxygen concentration to avoid excessive reducing atmosphere (easy to generate low melting point FeO instead of Fe?O?). Reduce the alkaline substances in the fuel ash (such as choosing low ash gas instead of coal).

        3. Process monitoring and maintenance

        1. Use infrared thermal imagers or thermocouples to monitor the surface temperature distribution of the cylinder in real time, and adjust it in time if local overheating is found. Install cameras or acoustic wave detectors to monitor the flow status of materials.

        2. Manually remove the rings when shutting down to avoid accumulation of blocks. Use high-pressure water guns or mechanical devices to clean the inner wall adhesive.

        3. Establish a ring formation warning model based on historical data (such as judging the ring formation risk through temperature, pressure, and current fluctuations).

        The above measures can significantly reduce the probability of ring formation. In practical applications, the solution should be flexibly adjusted based on specific processes (such as cement calcination, metallurgical roasting) and material characteristics. If serious ring formation has occurred, the machine should be shut down to avoid damage to the rotary kiln!


        主站蜘蛛池模板: 亚洲av永久无码天堂影院| 亚洲精品日本久久久中文字幕| 亚洲男人的天堂久久香蕉| 日韩一区二区三区精品区| 五月婷婷中文字幕| 亚洲欧洲一区二区免费| 亚洲a∨无码一区二区三区| 亚洲美女av一区二区| japan黑人极大黑炮| 不卡视频在线一区二区三区| 国产精品视频一区不卡| 亚洲午夜无码久久久久蜜臀av| 视频一区视频二区视频三| 精品无码久久久久国产| 久久婷婷成人综合色| 最新午夜男女福利片视频| 精品久久久久久无码人妻蜜桃| 国产又色又爽又黄刺激视频| 亚洲天堂一区二区成人在线| 欧美极品色午夜在线视频 | 精品久久久bbbb人妻| 亚洲av久久精品狠狠爱av| 亚洲免费观看视频| 亚洲综合高清一区二区三区| 国产精品国三级国产av| 免费无码又爽又刺激高潮虎虎视频 | 国产高清吹潮免费视频| 少妇宾馆粉嫩10p| 亚洲无人区码二码三码区| 绩溪县| 中文字幕人妻日韩精品| 五月婷婷中文字幕| 白丝乳交内射一二三区| 亚洲 中文 欧美 日韩 在线| 成年女人喷潮免费视频| 国产精品亚洲一区二区三区| 亚洲鸥美日韩精品久久| 色综合色综合色综合频道| 国产超碰无码最新上传| 日韩乱码视频一区二区三区| 亚洲精品国产一二三区|