<rt id="xa1e5"></rt>

<wbr id="xa1e5"><strike id="xa1e5"></strike></wbr>

        <abbr id="xa1e5"></abbr>
        中文国产成人精品久久不卡,亚洲国产精品一区二区第一页,亚洲人成电影在线天堂色,av中文字幕国产精品,亚洲精品毛片一区二区,二区中文字幕在线观看,一区二区不卡国产精品,精品一卡2卡三卡4卡乱码精品视频
        ×
        full text search
        Search
        ×
        Prompt information:
        Confirm
        +8618562287971
        NEWS&EVENTS
        Home > News&Events > Company news > Comparison of the installation cycle of tower furnace and π-type furnace
        Latest News
        Its main purpose is to collect the high-temperature flue gas rich in Sb?O? that volatilizes from the smelting furnace...
        2025.11.12
        Choosing mature solvent extraction-electrowinning technology and reliable copper extraction equipment is undoubtedly a key step in achieving efficient resource conversion and maximizing economic value...
        2025.11.12
        In the copper sulfide ore smelting process, the anode casting step is crucial...
        2025.11.11
        Exploring key auxiliary processes in scrap copper smelting..
        2025.11.11
        This document details the electrolytic refining process of scrap copper in an electrolytic cell...
        2025.11.10

        Comparison of the installation cycle of tower furnace and π-type furnace

        Release time:2025-01-13 11:46 Views:

        The tower furnace is a type different from the double flue boiler. Compared with the widespread use of double flue furnaces in China, my country is smaller in scale, while Europe is more popular. This type of boiler has been widely used in power stations and is suitable for different capacities, different parameters, and different fuels. Its characteristics are: its height is low, easy to arrange, easy to maintain, the tail flue gas is downward, which is convenient for dust removal, and the blower is arranged at the bottom

        Due to the different design structures, the tower furnace is more superior overall. The tower furnace has a simple structure and fast construction speed. The furnace body consists of a main frame, a sub-frame, and an independent hot blast furnace frame. The overall suspension structure of the blast furnace makes its force direction unidirectional, which can be expanded arbitrarily and there is no stress concentration phenomenon. The suspension structure is regular and the support structure is simple. Although the total weight of the entire structure is about 15% heavier than that of the π-type furnace, due to the smaller number of beams and parts, its price is cheaper, so the price of the steel structure is similar to that of the π-type furnace; in addition, on large equipment such as air ducts and air preheaters, the tower suspension design is simple and there are fewer hangers, so the installation speed is faster.

        tower furnace

        Because of its small installation section, tower boilers generally only use a single type, and the installation process is relatively convenient. The space between the two blast furnaces is large enough to install the crane on both sides of the boiler, and tower cranes can be arranged on both sides of the boiler, while the π-type furnace can only be arranged on the outside of the boiler. The tower crane + furnace top crane method, and the removal of the furnace top crane will occupy the boiler main line construction period of about 10 days.

        Combining the above analysis, from the on-site installation practice, the tower furnace generally has a higher assembly accuracy and a higher construction height during the construction process, and can adopt a single installation method, and the installation process is relatively convenient. The actual installation cost of the tower furnace is slightly higher than that of the π-shaped furnace: the tower furnace has a larger structure, smaller beam parts, and less installation cost, while the Π-shaped blast furnace is just the opposite; the tower furnace uses mirror welding, the welding cost is higher, and the number of welds on site in the blast furnace is slightly more; the tower furnace has fewer mixed boxes, and the parallel boxes are all outside the furnace. Compared with the π-shaped blast furnace, the overall construction period of the tower blast furnace is shortened by nearly half a month.

        From the perspective of installation technology, the tower furnace is more convenient in the construction process, and the installation accuracy is higher, and its installation height is also higher.

        主站蜘蛛池模板: 久久久久青草线综合超碰| 国产性色av高清在线观看 | 久久丁香五月天综合网| 国产精品久久欧美久久一区| 视频二区国产精品职场同事| 中文字幕久区久久中文字幕| 野外少妇被弄到喷水在线观看| 国产自产对白一区| 日日橹狠狠爱欧美视频| 最新亚洲人成网站在线影院| 亚洲国产天堂久久综合226114| 午夜免费无码福利视频麻豆| 国产高在线精品亚洲三区| 亚洲中文字幕国产精品| 亚洲精品美女一区二区| 榆树市| 成人动漫综合网| 亚洲免费视频一区二区三区| 成人精品动漫一区二区| 蜜臀av久久国产午夜福利软件| 老司机午夜精品视频资源| 视频二区国产精品职场同事 | 国产精品爽爽久久久久久| 鲁丝片一区二区三区免费| 日本不卡码一区二区三区| 宝贝腿开大点我添添公口述视频| 国产在线乱子伦一区二区| 国产乱子伦精品免费无码专区| 久久精品一区二区三区综合| 福利一区二区在线视频| 国产360激情盗摄全集| 国产精品入口麻豆| 国产乱码一区二区三区免费| 中文字幕无码成人免费视频| 黄床大片免费30分钟国产精品| 中文字幕色偷偷人妻久久| bt天堂新版中文在线| 日韩淫片毛片视频免费看| 一本大道卡一卡二卡三乱码全集资源| 免费无码高H视频在线观看| 欧美牲交40_50a欧美牲交aⅴ|